Waterproofing Restoration


  1. Remove existing cover materials as specified.
  2. Dispose of debris offsite or stockpile for reuse if requested.
  3. Remove existing waterproofing materials to perimeters of failure, ensuring that remaining materials are clean and bonded to surface, ready to receive overlaps, etc.
  4. Clean structural surfaces.
  5. Furnish and install waterproofing materials including primer, fillers, flashing and nailers, etc. per manufacturer’s specifications (using protection board and/or drainage mat as needed).
  6. Backfill or replace topping elements as required by this contract.
  7. Clean up job site.